Proses Pemeliharaan PMS 150 KV‼ Pelepasan & Pemasangan Kabel Listrik Tegangan Tinggi ❗Gardu Induk

3 min read 2 hours ago
Published on Nov 07, 2024 This response is partially generated with the help of AI. It may contain inaccuracies.

Table of Contents

Introduction

This tutorial provides step-by-step instructions for performing maintenance on high-voltage electrical cables, specifically focusing on the PMS 150 kV system at the Sampang Substation in Madura. The maintenance work is crucial for ensuring reliable electricity supply without interrupting service. This guide is designed for professionals in the electrical field and emphasizes safety and precision in high-voltage environments.

Step 1: Prepare for Maintenance

  • Gather Necessary Tools and Equipment
    • Insulation gloves
    • Safety goggles
    • Voltage testing equipment
    • Cable cutting and stripping tools
  • Conduct a Safety Briefing
    • Ensure all team members understand safety protocols.
    • Discuss emergency procedures and communication methods.
  • Inspect the Work Area
    • Check for any hazards, such as wet surfaces or unstable structures.
    • Ensure proper ventilation if working in enclosed spaces.

Step 2: Disconnect Power Safely

  • Identify the Circuit
    • Use voltage testing equipment to confirm the circuit is live.
  • Follow Lockout/Tagout Procedures
    • Lock the circuit breaker to prevent accidental re-energization.
    • Place tags indicating that maintenance is in progress.
  • Verify Power Disconnection
    • Re-test the circuit with voltage testing equipment to ensure it is completely de-energized.

Step 3: Remove Existing High-Voltage Cables

  • Prepare the Work Area
    • Clear any debris and ensure you have enough space to work safely.
  • Disconnect Cable Connections
    • Carefully remove any terminal connections using the appropriate tools.
  • Remove the Cable
    • Use cable pulling tools to safely extract the cable from its conduit.
    • Avoid excessive force to prevent damage to surrounding infrastructure.

Step 4: Install New High-Voltage Cables

  • Select Appropriate Cables
    • Ensure the new cables meet the specifications for 150 kV systems.
  • Install the Cable
    • Insert the new cable into the conduit.
    • Ensure it is properly seated and secure.
  • Reconnect Cable Terminals
    • Use the appropriate tools to connect the terminals, ensuring a tight and secure fit.

Step 5: Conduct Testing and Verification

  • Perform Insulation Resistance Testing
    • Use insulation testing equipment to verify cable integrity.
  • Check Connections
    • Inspect all terminal connections for proper installation.
  • Conduct a Final Voltage Test
    • Confirm that the circuit is ready to be energized by testing voltage levels.

Conclusion

In this tutorial, we covered essential steps for maintaining high-voltage cables in an online environment, ensuring safety and reliability. Key takeaways include the importance of preparation, following safety protocols, and conducting thorough testing before re-energizing the system. Always prioritize safety and accuracy in high-voltage maintenance tasks. For further learning, consider exploring advanced training in high-voltage electrical systems and maintenance techniques.