@harleydavidson Touring 97 to 08 - 4 point docking system and quick detach INSTALL

3 min read 20 hours ago
Published on Nov 13, 2024 This response is partially generated with the help of AI. It may contain inaccuracies.

Table of Contents

Introduction

This tutorial will guide you through the installation of the 97 to 08 Harley Davidson Touring Detachable Tour-Pack Conversion Kit. This kit allows you to easily attach and detach your tour pack, enhancing your motorcycle's versatility. Although installation may vary slightly by model and year, this guide provides the essential steps to facilitate the process.

Step 1: Gather Required Tools and Materials

Before starting the installation, ensure you have the following tools and materials on hand:

  • 3/8” socket wrench
  • 1/4” socket set
  • Torque wrench
  • Phillips screwdriver
  • Flathead screwdriver
  • The Detachable Tour-Pack Conversion Kit

Practical Tips

  • Review the installation manual that comes with the kit for any specific instructions.
  • Work in a well-lit area to avoid any mistakes.

Step 2: Prepare the Motorcycle

  • Place your motorcycle on a stable surface, using a center stand or a paddock stand if available.
  • Ensure the motorcycle is turned off and secured.

Common Pitfalls to Avoid

  • Do not attempt to install the kit on an unstable or uneven surface to prevent accidents.

Step 3: Remove Existing Mounting Hardware

  • Locate and remove the existing tour pack or any mounting hardware currently on your motorcycle.
  • Use the socket wrench to loosen and take out the mounting bolts.

Step-by-Step

  1. Identify the existing bolts holding the tour pack in place.
  2. Use the appropriate socket size to remove these bolts.
  3. Safely set aside the removed hardware for future use or disposal.

Step 4: Install the Docking Hardware

  • Position the new docking hardware onto your motorcycle frame.
  • Align the holes of the docking hardware with the existing holes on the motorcycle.

Installation Steps

  1. Place the docking hardware onto the designated area on the frame.
  2. Insert the bolts through the holes in the docking hardware.
  3. Use the torque wrench to tighten the bolts to the recommended torque settings (check the manual for specifications).

Step 5: Attach the Tour-Pack

  • With the docking hardware securely installed, it’s time to attach the tour pack.

Steps to Attach

  1. Lift the tour pack and align it with the docking hardware.
  2. Push down firmly until it clicks into place.
  3. Ensure the tour pack is securely attached by checking that it is stable and does not wobble.

Step 6: Final Checks

  • After installation, double-check all bolts and connections.
  • Test the detachment mechanism to ensure it operates smoothly.

Practical Advice

  • If the tour pack does not detach easily, recheck the alignment of the docking hardware.

Conclusion

Installing the 97 to 08 Harley Davidson Touring Detachable Tour-Pack Conversion Kit is a straightforward process that enhances your bike’s functionality. Remember to gather all tools beforehand, follow each step carefully, and ensure everything is securely fastened. After installation, enjoy the convenience of easily attaching and detaching your tour pack on your rides. If you have any issues or questions, refer to the installation manual or consult a professional.