Subaru EJ25 Engine Build Tutorial - Step by Step Guide
4 min read
7 months ago
Published on Aug 06, 2024
This response is partially generated with the help of AI. It may contain inaccuracies.
Table of Contents
Introduction
This tutorial provides a comprehensive step-by-step guide for building a Subaru EJ25 engine, based on a detailed YouTube tutorial. Whether you're a seasoned mechanic or a DIY enthusiast, this guide will help you understand the necessary tools, measurements, and assembly techniques to successfully build your engine.
Chapter 1: Tools Needed
Before beginning your engine build, gather the following tools and components:
Essential Parts
- Case Halves: Use a set of 703 castings; send them to a trusted machine shop like Outfront Motorsports for machining.
- Crankshaft: Use a nitrated crankshaft from a 2018+ STI.
- Case Bolts: Brand new zinc-coated bolts or ARP bolts (requires line boring).
- Pistons: CP Pistons (9975 in diameter).
- Connecting Rods: Manley H tough rods for strength.
- Bearings: King coated bearings.
- Piston Rings: Essential for sealing.
Required Tools
- Measuring Tools: Calipers, micrometers, and a dial bore gauge.
- Torque Wrenches: 3/8 inch and half inch.
- Assembly Tools: Rubber mallet, piston ring compressor, and an ARP lubricant.
- Cleaning Supplies: Parts cleaner, brake cleaner, paper towels, and compressed air.
Specialty Tools
- Dial Bore Gauge: For measuring bearing clearances.
- Rod Bolt Stretch Gauge: Optional for high-power builds.
Chapter 2: Crankshaft Measurements
- Calibrate Measuring Tools: Zero out your gauge to ensure accurate measurements.
- Clean Crankshaft: Wipe down the crankshaft journals with parts cleaner.
- Measure Main Bearings:
- Use micrometers to measure each journal.
- Record measurements carefully to ensure consistency.
- Verify Measurements: Repeat measurements to confirm accuracy.
Chapter 3: Case Assembly
- Prepare Case Halves: Remove any shipping bolts and lightly tap to separate.
- Install Bearings:
- Clean journal areas and install the main bearings.
- Ensure the thrust bearing is properly positioned.
- Torque Case Halves Together:
- Follow the specified torque sequence and specs, starting at 7.4 lb-ft and working up to 14.8 lb-ft.
- Complete multiple rounds of torqueing, including 90-degree increments.
Chapter 4: Main Bearing Clearance
- Measure Bearing Clearances:
- Use a dial bore gauge to check clearances against crankshaft measurements.
- Target a clearance of 0.002 to 0.004 inches.
- Adjust Bearings if Necessary: Mix and match standard and oversized bearings as needed to achieve desired clearances.
Chapter 5: Connecting Rod Install
- Prepare Connecting Rods:
- Ensure tangs on bearings are aligned (tang to tang).
- Clean the bearing surfaces.
- Torque Connecting Rods:
- Use ARP lube and torque to specified values (start at 30 lb-ft, then 55 lb-ft, and finally 90 lb-ft).
Chapter 6: Case Prep & Crank Install
- Clean and Lubricate: Wipe down bearings and crankshaft with assembly lube.
- Install Crankshaft: Position the crankshaft into the case and align the connecting rods.
- Seal and Bolt Case Halves: Apply sealant and bolt both halves together, ensuring a proper seal.
Chapter 7: Piston Ring Cutting
- Measure and Cut Rings:
- Measure top and oil scraper rings for proper gap (0.014" for the top ring).
- Use a piston ring cutter and check gaps with feeler gauges.
- Install Rings: Ensure proper orientation and fit of all rings on the pistons.
Chapter 8: Piston Install
- Lubricate and Insert Pistons:
- Apply oil to piston skirts.
- Carefully slide the piston into the cylinder, aligning with the connecting rod.
- Secure Wrist Pin: Insert the wrist pin and secure with clips.
Conclusion
By following this tutorial, you are now equipped with the knowledge to build a Subaru EJ25 engine. Remember to double-check all measurements and torque specifications throughout the process. For your next steps, consider installing additional components and preparing the engine for final assembly into your vehicle. Happy building!