Editando o layout de um sistema na plataforma de monitoramento SolarEdge

3 min read 1 year ago
Published on Aug 02, 2024 This response is partially generated with the help of AI. It may contain inaccuracies.

Table of Contents

Introduction

This tutorial will guide you through the process of editing a site layout in the SolarEdge monitoring platform. By following these steps, you will learn how to set up your site accurately, place photovoltaic (PV) modules, and configure electrical design elements. This is essential for optimizing the performance of your solar energy system.

Step 1: Access the Layout Editor

  • Navigate to the physical layout tab of the SolarEdge monitoring platform.
  • Click on "Open Layout Editor."
  • Confirm your site address by ensuring the pin indicates the correct location. Adjust the pin if necessary.

Step 2: Adjust the View

  • Use the mouse scroll wheel to zoom in or out until the entire site fits within the blue box.
  • Once the site is correctly positioned, click "Confirm." You will then be taken to the PV placement tab.

Step 3: Optional Site Modeling

  • If you wish to create a 3D model of the site, click on the "Site Modeling" tab. Note that this step is optional.

Step 4: Place PV Modules

  • In the PV placement tab, click "Add PV Modules."
  • Verify the manufacturer's details and model of the modules. These details are imported from the monitoring platform but can be adjusted if necessary.
  • Set the racking type, tilt angle, and azimuth.
  • Align the map using the mouse scroll wheel and click and drag to place the modules where needed.

Step 5: Configure Electrical Design

  • Select an inverter and connect the modules to it.
  • After stringing the modules, click the "Select" button.
  • Drag the inverter to your desired location on the layout.

Step 6: Map Power Optimizers

  • Click the toggle on the top right side of the screen to enter mapping mode.
  • Start with the first module in the string:
    • Click on the module and type the serial number of the connected power optimizer.
    • Use the keyboard arrows to navigate through the list and press "Enter" to select the serial number.
  • Repeat this process for each module in the string. The next module will automatically be selected after entering the serial number.
  • Alternatively, you can assign serial numbers from the side panel by clicking on the serial number and then clicking the module to assign it.

Step 7: Monitor Progress

  • As you assign serial numbers, track your progress in the side panel’s progress bar. This visual indicator shows how much of the site mapping has been completed.

Step 8: Publish Changes

  • Once you have completed mapping the site and assigning serial numbers, click "Publish" to save your changes.
  • Ensure that your updates are reflected in the monitoring platform.

Conclusion

You have successfully edited the layout of your solar monitoring system on the SolarEdge platform. By following these steps, you can ensure that your PV modules and electrical configurations are set up accurately. Next steps may include monitoring the performance of your system or making further adjustments based on your energy needs.